Whether your new house
was designed by Solo, your own Architect
or you, we always advise that the Building
Control drawings are carried out by your
chosen Timber Frame supplier.
We say this because there
are a myriad of technical details that differ
between Timber Frame and the more widely
understood brick and block systems.
Its not unusual for an Architect instructed
by his or her client to produce Working
Drawings, and inexperienced with Timber
Frame construction to ring us many times
asking for technical details. In those circumsatnces
you're paying your Architect for additional
hours, and there is more danger of mistakes
being made which can prove very costly once
on site..
Solo's Architectural Technician
will produce full Working Drawings either
from your own Architects paper drawings,
CAD files or as part of our own design service.
Useful tip:
When instructing an independent Architect
or Designer, ensure that it's written into
your agreement that once the design is complete,
they supply you with the CAD files. Some
designers are reluctant to release them,
and it means that we have to redraw the
design which adds time and cost to your
project.